Solar Photovoltaic (PV) Rooftop Projects (Part C2: High Voltage Electrical Works) at P/E Innovest, P/E Polypak & P/E CFA3

Sunrich Goliath

2,200,000

Aug 2012

Solar Photovoltaic (PV) Rooftop Projects (Part C2: High Voltage Electrical Works) at P/E George Kent & P/E AQ Timber, Shah Alam

Sunrich Goliath

1,040,000

Dec 2012

Solar Photovoltaic (PV) Jungle Land Project (Part C2: High Voltage Electrical Works) at P/E Sertik, Bentong

Great Arowana

1,000,000

Dec 2012

Solar Photovoltaic (PV) Jungle Land Project (Part C2: High Voltage Electrical Works) at PMU Hutan Melintang

Malaysian Solar Resources

445,000

Feb 2013

Solar Photovoltaic (PV) Rooftop Projects (Part C2: High Voltage Electrical Works) at P/E Innovest & P/E Cahaya Nurani, Shah Alam

Falcon Conquest  Sdn. Bhd.

900,000

Dec 2013

Solar Photovoltaic (PV) Rooftop Projects (Part C2: High Voltage Electrical Works) at P/E Protex Rubber Port Klang

Energy Sunbest Sdn. Bhd.

779,000

Dec 2013

Solar Photovoltaic (PV) Rooftop Projects (Part C2: High Voltage Electrical Works) at MAS Cargo

Sun Edison

779,000

July 2014

Solar Photovoltaic (PV) Rooftop Projects (Part C2: Low Voltage Electrical Works) at P/E Subang Depot

Vital Star Libra Sdn. Bhd.

320,000

Dec 2015

SISB/RVSB/LOA/1463/18/004 Design, Supply, Install, Testing and Commissioning of 3.5Mv(AC) Solar BIPV Systems with Associated  Works under Package C (HV Interconnection Works) at Lot 9902, Mukim Sura, Daerah Dungun Terengganu

Suria Infinity

420,000

Nov 2019

Solar Photovoltaic (PV) Rooftop Projects (Part C2: Low Voltage Electrical Works)at P/E Southern Plastic Products, Butterworth, Penang

Vital Star Libra Sdn. Bhd.

160,000

Dec 2015